Re: Bruxelles Dragos31

Schuman (M1, M5)

La nivelul inferior - statie de metrou.
La nivelul superior - statie de trenuri regionale.

























Trone (M2, M6)








 


Re: Bruxelles - metroul STIB Dragos31

Avand in vedere completarea parcului de pe liniile 1 și 5 cu noile CAF Inneo M7, o parte din trenurile M6 de aici au fost de luni transferate pe liniile 2 si 6, pentru retragerea catorva rame La Brugeoise et Nivelles M90.

Mai simplu, in prezent, distributia ramelor pe retea ar trebui sa fie urmatoarea.

Liniile 1 si 5: CAF Inneo M6 si M7.
Liniile 2 si 6: La Brugeoise M90 si CAF Inneo M6.

CAF Inneo M6 linia 6.jpg (207.95 KB; downloaded 732 times)


Sursa foto si info: Instagram/stibmivb - https://instagram.com/stibmivb?igshid=YmMyMTA2M2Y

 


Re: Metroul STIB punmeister

Si deja noile trenuri M7 au probleme. Ce bine ca au pierdut licitatia pentru BM4  :twisted:  :twisted:  :twisted:

Operator MIVB in Brussels is experiencing difficulties with its new CAF-produced M7 metro rolling stock. Above-average wheel wear is causing excessive noise and vibration impact, resulting in complaints from citizens. MIVB has accelerated its preventative maintenance programme as a result.

Since the start of the year, MIVB has received numerous complaints from people living near the metrotunnels. The uptick in complaints coincided with the introduction of the new M7 rolling stock on certain lines. Analysis revealed wheel wear that normally only appears after several thousand kilometres. Curiously, not all wheels are affected the MIVB has determined.

The Brussels operator has since installed track-side monitoring equipment to detect out-of-round wheels so as to better schedule its maintenance activities. Some 800 wheels have already been corrected, MIVB told sister publication RailTech.be during a visit of the maintenance facility.

Correcting the faulty wheels is only a temporary solution, and MIVB is in talks with manufacturer CAF to arrive at a more permanent solution.

MIVB has also established elevated track wear following the increase in the frequency of metro services on certain lines. The company’s track maintenance schedule has been adapted accordingly, it said.


https://www.railtech.com/rolling-stock/2 ... el-wear/

 


Re: Metroul STIB Gabi23

261 în stația Heysel
261 - 08.10.2023.JPG (316.13 KB; downloaded 317 times)

 


Go to page:  1 2
 
 

📖 Pagination options
Home page  • 
Parent forum: Bruxelles  • 
Choose destination

Since our 2289 forum members have written 421198 posts in 5246 topics and 513 subforums.

 

© 2009 - 2024 Asociația „Metrou Ușor”

Powered by PhpBB In DotNet

The Terms Of Use