Topic: Reportaj santier - 13 August 2010

7 posts, 3944 views
  • Utilizator anonim
  • Posted:
  •  

Reportaj santier - 13 August 2010 Utilizator anonim

Lucrarile sunt realizate spre 95%, astazi se incheie montarea grinzilor principale ale tablierului podului hobanat.
IMG_9278.JPG (260.18 KB; downloaded 3502 times)
IMG_9282.JPG (263.48 KB; downloaded 3494 times)
IMG_9283.JPG (226.62 KB; downloaded 3491 times)
IMG_9284.JPG (258.82 KB; downloaded 3502 times)
IMG_9286.JPG (252.04 KB; downloaded 3506 times)
IMG_9287.JPG (285.4 KB; downloaded 3493 times)
IMG_9291.JPG (266.14 KB; downloaded 3494 times)
IMG_9293.JPG (239.75 KB; downloaded 3483 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Tot la podul hobanat se lucreaza la partea de hobane, se monteaza piesele din pilon pe unde in maxim 2 saptamani vor incepe sa fie trase hobanele.
IMG_9290.JPG (269.46 KB; downloaded 3466 times)
IMG_9298.JPG (252.06 KB; downloaded 3471 times)
IMG_9299.JPG (239.2 KB; downloaded 3482 times)
IMG_9300.JPG (187.5 KB; downloaded 3474 times)
IMG_9301.JPG (264.55 KB; downloaded 3499 times)
IMG_9401.JPG (180.13 KB; downloaded 3481 times)
IMG_9409.JPG (302.57 KB; downloaded 3490 times)
IMG_9412.JPG (259.31 KB; downloaded 3492 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Astazi a fost turnata ultima sectiune a tablierului pasajului din zona Plevnei, mai ramane capatul acesteia saptamana viitoare. Astfel se incheie toate lucrarile de turnare a tablierului la Pasajul Basarab.
IMG_9297.JPG (248.28 KB; downloaded 3486 times)
IMG_9304.JPG (241.27 KB; downloaded 3467 times)
IMG_9305.JPG (232.71 KB; downloaded 3486 times)
IMG_9312.JPG (223.76 KB; downloaded 3480 times)
IMG_9319.JPG (218.9 KB; downloaded 3487 times)
IMG_9335.JPG (218.47 KB; downloaded 3479 times)
IMG_9339.JPG (230.28 KB; downloaded 3490 times)
IMG_9342.JPG (274.99 KB; downloaded 3481 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Luna viitoare se incheie realizarea finisajelor pe tot tablierul intre podul hobanat si Vasile Milea.
IMG_9343.JPG (191.59 KB; downloaded 3482 times)
IMG_9350.JPG (307.36 KB; downloaded 3477 times)
IMG_9352.JPG (205.75 KB; downloaded 3476 times)
IMG_9353.JPG (222.88 KB; downloaded 3475 times)
IMG_9365.JPG (213.25 KB; downloaded 3456 times)
IMG_9372.JPG (258.13 KB; downloaded 3487 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

In toata zona Vasile Milea - Grozavesti (partial si podul Grozavesti) se redeschide traficul pana pe 20 septembrie.
IMG_9359.JPG (282.05 KB; downloaded 3448 times)
IMG_9364.JPG (311.94 KB; downloaded 3459 times)
IMG_9367.JPG (304.8 KB; downloaded 3472 times)
IMG_9369.JPG (314.03 KB; downloaded 3470 times)
IMG_9371.JPG (311.2 KB; downloaded 3476 times)
IMG_9373.JPG (300.81 KB; downloaded 3468 times)
IMG_9374.JPG (316.45 KB; downloaded 3469 times)
IMG_9376.JPG (283.97 KB; downloaded 3473 times)
IMG_9378.JPG (261.8 KB; downloaded 3464 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Pana la 15 septembrie se incheie si realizarea liniilor de tramvai in intersectia Giulesti - Plevnei.
IMG_9310.JPG (272.91 KB; downloaded 3458 times)
IMG_9314.JPG (266.05 KB; downloaded 3464 times)
IMG_9321.JPG (273.64 KB; downloaded 3459 times)
IMG_9331.JPG (246.04 KB; downloaded 3509 times)
IMG_9380.JPG (261.29 KB; downloaded 3476 times)
IMG_9381.JPG (283.8 KB; downloaded 3460 times)
IMG_9385.JPG (272.14 KB; downloaded 3462 times)
IMG_9394.JPG (188.14 KB; downloaded 3461 times)
IMG_9396.JPG (282.4 KB; downloaded 3472 times)

 


  • Utilizator anonim
  • Posted:
  •  

Re: Reportaj santier - 13 August 2010 Utilizator anonim

Lucrarile au avansat si pe Sos. Orhideelor. Traficul se va redeschide in aproape toate zonele adiacente pasajulu treptat incepand cu luna septembrie.
IMG_9294.JPG (225.69 KB; downloaded 3454 times)
IMG_9332.JPG (304.54 KB; downloaded 3431 times)
IMG_9346.JPG (297.46 KB; downloaded 3416 times)
IMG_9348.JPG (326.83 KB; downloaded 3412 times)

 


Home page  • 
Parent forum: Arhiva reportajelor anului 2010  • 
Choose destination

Since our 2705 forum members have written 464325 posts in 5795 topics and 541 subforums.

 

© 2009 - 2026 Asociația „Metrou Ușor”

Powered by PhpBB In DotNet

The Terms Of Use