Zona metropolitană BucureștiLucrări de modernizare și extindere a infrastructuriiLucrări finalizate începând cu anul 2006Modernizarea sistemului rutier și a liniilor de tramvai pe Bd. Liviu Rebreanu (FINALIZAT octombrie 2018)Reportajele anului 2014

 

Topic: August 2014

9 posts, 3579 views
August 2014 PinkyHog

7 august 2014
IMAG2924.jpg (715.82 KB; downloaded 3419 times)

 


Re: August 2014 PinkyHog

8 august 2014

Am asteptat sa se usuce gazonul ca sa inauguram darea in folosinta a sistemului de irigatie.  :evil:
IMAG2925.jpg (720.02 KB; downloaded 3267 times)
IMAG2927.jpg (828.59 KB; downloaded 3267 times)
IMAG2928.jpg (723.93 KB; downloaded 3267 times)
IMAG2931.jpg (782.4 KB; downloaded 3267 times)

 


Re: August 2014 Victor92

15 August 2014
DSC_3654.JPG (270.9 KB; downloaded 3014 times)
DSC_3655.JPG (233.88 KB; downloaded 3014 times)
DSC_3659.JPG (239.42 KB; downloaded 3014 times)
DSC_3660.JPG (273.11 KB; downloaded 3015 times)
DSC_3661.JPG (317.74 KB; downloaded 3014 times)
DSC_3662.JPG (261.79 KB; downloaded 3014 times)
DSC_3663.JPG (237.74 KB; downloaded 3014 times)
DSC_3664.JPG (252.19 KB; downloaded 3014 times)
DSC_3665.JPG (245.94 KB; downloaded 3014 times)
DSC_3666.JPG (244.59 KB; downloaded 3014 times)
DSC_3667.JPG (291.05 KB; downloaded 3014 times)
DSC_3668.JPG (290.38 KB; downloaded 3014 times)
DSC_3669.JPG (248.4 KB; downloaded 3015 times)
DSC_3670.JPG (347.91 KB; downloaded 3014 times)
DSC_3671.JPG (323.12 KB; downloaded 3014 times)
DSC_3674.JPG (254.25 KB; downloaded 3014 times)

 


Re: August 2014 cris_m

26 August 2014

Intrucat am ramas dator cu niste poze pentru acest topic, am zis astazi de dimineata sa imi iau aparatul foto si sa imi spal pacatele...  :)
Situatia se prezinta astfel:

-UTI lucra la intresectia Rebreanu-Grigorescu la semafoarele recent instalate, dar si la camerele de supraveghere din intersectie. Ca o remarca personala, insula aceea construita de Mister Negoita nu a fost data jos, ba chiar a fost revopsita intr-un roz si mai inchis :!:
Mereu zambitor, cu UTI in ajutor :p
DSC_3734 (Custom).JPG (145.97 KB; downloaded 2717 times)
Insula cu pricina
DSC_3735 (Custom).JPG (122.21 KB; downloaded 2717 times)


-linia de tramvai este montata pe sensul spre Nicolae Grigorescu pana la aleea Zăvideni, pe sensul celalalt muncitorii lucrand dimineata de zor la turnarea betonului si asezarea liniilor. :o  

-pe toata portiunea din fata Mega Image au asezat in proportie de 90% armaturile pentru pedalele sinelor, restul asteptandu-si cuminti randul in locul viitoarei statii de tramvai. Au turnat fundatiile de la Barajul Sadului pana aproape de Barajul Dunarii, urmand ca in saptamanile urmatoare sa ajunga si la Barajul Dunarii unde terenul nu este inca excavat si tasat.

-trotuarele si parcarile pe parte cu Mega Image si Lidl sunt aproape gata, azi fiind ceva miscare in fata Lidl, in locul unde au spart trotuarul cei de la Radet pentru lucrarile de termoficare. Pe partea opusa, trotuarul este realizat in proportie de 95% pana la Barajul Dunarii, ramanand de asfaltat pista de biciclete care este ceva mai lata decat pe primul tronson...

-Radet lucreaza de zor in fata la CEC-ul de langa Titan, acolo fiind o groapa de toata frumusetea. Gropile din dreptul aleei Zavideni si Barajul Sadului au fost astupate intr-un final

-pe tronsonul de la Barajul Dunarii pana la 1 Decembrie 1918 nu este nici o miscare, singurul element care iti sare in ochi este panoul informativ al Radet-ului care se vede de la o posta :roll:

Per total, se misca mai natural decat pe primul tronson, eu apreciez ca undeva prin jumatatea lui noiembrie-inceputul lui decembrie ar fi gata tronsonul Nicolae Grigorescu- Bd 1 Decembrie 1918.
Privelistea bulevardului dinspre Titan
DSC_3733 (Custom).JPG (142 KB; downloaded 2717 times)
Trag tare baietii
DSC_3736 (Custom).JPG (137.1 KB; downloaded 2717 times)
Privelistea bulevardului spre Titan
DSC_3738 (Custom).JPG (143.87 KB; downloaded 2718 times)
Linii sunt pe pozitii
DSC_3751 (Custom).JPG (162.52 KB; downloaded 2711 times)
Linii sunt pe pozitii
DSC_3752 (Custom).JPG (142.74 KB; downloaded 2711 times)
Fundatiile spre Titan
DSC_3743 (Custom).JPG (151.87 KB; downloaded 2712 times)
Armaturile la bronzat
DSC_3741 (Custom).JPG (144.22 KB; downloaded 2711 times)
Fundatiile spre Barajul Dunarii
DSC_3742 (Custom).JPG (144.01 KB; downloaded 2711 times)

 


Re: August 2014 cris_m

Contiunarea
Fundatiile de la Zavideni spre Sadului
DSC_3737 (Custom).JPG (158.89 KB; downloaded 2697 times)
Parcarile in fata la Mega Image
DSC_3740 (Custom).JPG (144.92 KB; downloaded 2697 times)
Refacere trotuar distrus
DSC_3744 (Custom).JPG (163.8 KB; downloaded 2702 times)
Barajul Dunarii
DSC_3745 (Custom).JPG (134.04 KB; downloaded 2696 times)
Barajul Dunarii
DSC_3747 (Custom).JPG (120.13 KB; downloaded 2738 times)
Spre 1 Decembrie
DSC_3746 (Custom).JPG (128 KB; downloaded 2696 times)
Terminalul gol de la Barajul Dunarii
DSC_3748 (Custom).JPG (169.12 KB; downloaded 2696 times)
Panoul informativ al Radetului
DSC_3750 (Custom).JPG (152.46 KB; downloaded 2734 times)
Groapa Radet astupata de langa blocul N1
DSC_3739 (Custom).JPG (163.24 KB; downloaded 2696 times)
Groapa Radet din fata CEC
DSC_3754 (Custom).JPG (160.17 KB; downloaded 2696 times)

 


Re: August 2014 PinkyHog

27 august 2014

Cateva completari la cele spuse de @ cris_m, plus cateva poze:

- groapa din dreptul blocului N1 este tot groapa, RADET-ul n-a astupat-o inca, intrucat n-au fost schimbate conductele din acea zona.
IMAG3594.jpg (776 KB; downloaded 2492 times)

- inainte de MegaImage avem o zona cu trotuar partial refacut si fara parcari in spic, bordura fiind paralela cu drumul si delimitand niste parcari in aliniament.
IMAG3597.jpg (825.14 KB; downloaded 2492 times)

- treptele de la trotuarul de pe partea cu blocurile de pe stanga (sens spre Titan) nu sunt deloc abrupte, cum zicea @ ByOnu
IMAG3580.jpg (754.17 KB; downloaded 2492 times)

 


Re: August 2014 PinkyHog

Continuarea cu alte cateva poze

Sensul spre Titan, pe partea stanga
trotuar 01.jpg (768.87 KB; downloaded 2634 times)

trotuar 02.jpg (839.17 KB; downloaded 2590 times)

trotuar 03.jpg (783.63 KB; downloaded 2485 times)

trotuar 04.jpg (826.23 KB; downloaded 2485 times)

Au aparut stalpisorii in statia RATB
trotuar 05.jpg (662.59 KB; downloaded 2485 times)

 


Re: August 2014 PinkyHog

Continuare

Sensul spre Barajul Dunarii, pe partea stanga.
trotuar 06.jpg (918.72 KB; downloaded 2483 times)
trotuar 07.jpg (827.01 KB; downloaded 2483 times)
Stalpisorii sunt deja strambi :(
trotuar 08.jpg (663.21 KB; downloaded 2483 times)
trotuar 09.jpg (853.95 KB; downloaded 2483 times)
trotuar 10.jpg (944.92 KB; downloaded 2483 times)
trotuar 11.jpg (879.22 KB; downloaded 2483 times)
trotuar 12.jpg (743 KB; downloaded 2483 times)
trotuar 13.jpg (713.39 KB; downloaded 2483 times)
trotuar 14.jpg (886.09 KB; downloaded 2485 times)

 


Re: August 2014 PinkyHog

Continuare


RADET-ul a astupat groapa din carosabil si acum aduce zona la forma initiala.
linie 9.jpg (772.84 KB; downloaded 2481 times)

Groapa este in spatele cosmeliei EvoCasa
trotuar 16.jpg (796.28 KB; downloaded 2483 times)

trotuar 15.jpg (841.39 KB; downloaded 2481 times)



Bonus

linie 7.jpg (748.26 KB; downloaded 2480 times)

 


Home page  • 
Parent forum: Reportajele anului 2014  • 
Choose destination

Since our 2419 forum members have written 433196 posts in 5388 topics and 518 subforums.

 

© 2009 - 2024 Asociația „Metrou Ușor”

Powered by PhpBB In DotNet

The Terms Of Use