Topic: Rame electrice clasa 101 (Alstom Coradia Stream)
172 posts, 45778 views
📖 Pagination options
- punmeister
-
Posted:
-
Rame electrice clasa 101 (Alstom Coradia Stream)
punmeister
E oficial...
https://www.alstom.com/press-releases-ne ... ains-and
E oficial...
25 March 2022 – Alstom and the Romanian Railway Reform Authority (ARF) have signed a contract for the delivery of 20 Coradia Stream inter-regional trains and associated 15-year maintenance services. The value of the contract is estimated at €270 million. These trains will be the first passenger trains provided by Alstom for operation in Romania.
The contract can be extended with the option for another 20 trains, to be confirmed by firm order from the beneficiary. Including extended maintenance on the entire fleet, the total estimated value of the project could thus exceed €750 million.
“The new inter-regional electric trains for Romania will contribute to more modern and sustainable transportation in Romania – in line with our ambition to lead the way towards greener and smarter mobility worldwide. I am delighted that our Coradia trains, highly appreciated in so many European countries, will run in Romania as well. This contract completes the very diverse portfolio of Alstom solutions in this country, covering all our key business lines, from signalling and infrastructure projects to metro trains and complex maintenance capabilities,” said Gian Luca Erbacci, President of Alstom Europe.
Each train will have six cars, a total capacity of 350 seats and 100% low floor, to assure easy access for all passengers. There will be two entry doors on each side of the middle cars and one door for each side of the end cars. The passenger information system will include a sound system and a dynamic display system. Each train car will be equipped with large-size luggage racks.
The Coradia Stream trains will also be equipped with a digital system for passenger counting with high-precision sensors. Each train will have four ecological toilets, evenly distributed along the entire length of the train, with one designed for people with reduced mobility. The final configuration, colors and finishes will be fully customised according to the requirements of the Contracting Authority during the design stage.
The train is part of Alstom’s Coradia range of regional trains, with performance in operation demonstrated throughout Europe for over thirty years. To date, Alstom has sold 3,300 Coradia trains worldwide. Several European countries, including Denmark, France, Germany, the Netherlands and Spain, already benefit from their performance and comfort.
In total, over 420 Coradia Stream trains have already been ordered in Italy, the Netherlands and Denmark. Those in Italy have been in service since mid-2019, proving the reliability of this product. Coradia Stream also offers emission-free solutions, such as battery and hydrogen powered traction, for non-electrified lines.
Alstom has been active in Romania for almost 30 years and is a market leader in railway electrification and signalling solutions. The company is responsible for implementing signalling or electrification solutions on more than 75% of the Rhine-Danube railway corridor in Romania. The first CBTC urban signalling solution in the country is under implementation by Alstom on Bucharest’s metro Line 5. The company has also been the provider of maintenance services for the Bucharest metro fleet for the last 17 years.
https://www.alstom.com/press-releases-ne ... ains-and
Romania_Coradia Stream RE-IR_ext view 1.jpg (178.51 KB; downloaded 5795 times)
- PTMZ
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
PTMZ
Oficial până vine CRRC-Astra cu vreo decizie a CJUE și/sau a C.A.B...
Părerea mea e că topicul a fost deschis cam timpuriu, având în vedere situația legală care este acum.
Oficial până vine CRRC-Astra cu vreo decizie a CJUE și/sau a C.A.B...
Părerea mea e că topicul a fost deschis cam timpuriu, având în vedere situația legală care este acum.
- punmeister
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
punmeister
CAB a pasat procesul la CJUE din motive evidente. Vor veni clar cu o decizie impotriva CRRC, iar de acolo nu mai ai unde sa mergi inainte.
Daca nu pasau, Beijingul mai putea sa mearga eventual la ICCJ, si mai pierdeam timp si acolo.
CAB a pasat procesul la CJUE din motive evidente. Vor veni clar cu o decizie impotriva CRRC, iar de acolo nu mai ai unde sa mergi inainte.
Daca nu pasau, Beijingul mai putea sa mearga eventual la ICCJ, si mai pierdeam timp si acolo.
- orex
-
Posted:
-
- punmeister
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
punmeister
Au fost puse spre dezbatere prin Google Forms, schema de vopire interior+exterior a viitoarelor rame Coradia Stream.
https://docs.google.com/forms/d/e/1FAIpQ ... viewform
Au fost puse spre dezbatere prin Google Forms, schema de vopire interior+exterior a viitoarelor rame Coradia Stream.
https://docs.google.com/forms/d/e/1FAIpQ ... viewform
2022-06-15 09 21 31.jpg (59.45 KB; downloaded 5185 times)
2022-06-15 09 19 40.jpg (60.91 KB; downloaded 5185 times)
2022-06-15 08 40 333333.jpg (22.35 KB; downloaded 5185 times)
2022-06-15 08 40 22222.jpg (23.12 KB; downloaded 5185 times)
2022-06-15 08 40 27 (1).jpg (22.66 KB; downloaded 5185 times)
2022-06-15 09 01 18.jpg (28.58 KB; downloaded 5185 times)
2022-06-15 08 58 44.jpg (26.91 KB; downloaded 5185 times)
2022-06-15 08 53 07.jpg (26.3 KB; downloaded 5185 times)
2022-06-15 08 40 27.jpg (29.13 KB; downloaded 5185 times)
- Dristorul Nr.3
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
Dristorul Nr.3
Parca nu era vorba ca parcul CFR Calatori va fi standardizat cu schema express? Care-i treaba? Ne intoarcem la metehnele vechi?
Parca nu era vorba ca parcul CFR Calatori va fi standardizat cu schema express? Care-i treaba? Ne intoarcem la metehnele vechi?
- PTMZ
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
PTMZ
Ramele acestea nu vor ajunge doar la CFR Călători (în teorie, cel puțin).
Ramele acestea nu vor ajunge doar la CFR Călători (în teorie, cel puțin).
- shoppy
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
shoppy
Dupa Express au vopsit clasice, tricolore, elodii si pume, a murit de ani buni standardizarea.
Dupa Express au vopsit clasice, tricolore, elodii si pume, a murit de ani buni standardizarea.
- Dristorul Nr.3
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
Dristorul Nr.3
Fain ar fi sa ajunga (si) la Softrans, companie care si-a cladit imaginea pe produsul lor propriu, Hyperion.
Fain ar fi sa ajunga (si) la Softrans, companie care si-a cladit imaginea pe produsul lor propriu, Hyperion.
- Andrei98
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
Andrei98
Pai ei ar fi singurii care ar merita sa primeasca o rama. Restul au adus cele mai ieftine sh-uri si cu alea si-au scos banii din subventie, in rest zero investitii.
Pai ei ar fi singurii care ar merita sa primeasca o rama. Restul au adus cele mai ieftine sh-uri si cu alea si-au scos banii din subventie, in rest zero investitii.
- punmeister
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
punmeister
TOTI operatorii vor primi in functie de cota lor de piata.
TOTI operatorii vor primi in functie de cota lor de piata.
- shoppy
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
shoppy
Investitia facuta de sh-uri a fost ca au salvat de la disparitie toate liniile secundare pe care circula, ca daca ar fi ramas la Calatori s-ar fi inchis si furat totul, cu toata subventia.
Tot respectul pentru Softronic, dar ei circula doar pe magistrale electrificate, si pana la urma a fost doar o afecere care nu le-a iesit, drept dovada ca nu s-au sacrificat pentru patrie ci au abandonat proiectul si s-au concentrat pe locomotive de marfa (bine, daca acum primesc rame, poate ca in final le-a iesit).
Investitia facuta de sh-uri a fost ca au salvat de la disparitie toate liniile secundare pe care circula, ca daca ar fi ramas la Calatori s-ar fi inchis si furat totul, cu toata subventia.
Tot respectul pentru Softronic, dar ei circula doar pe magistrale electrificate, si pana la urma a fost doar o afecere care nu le-a iesit, drept dovada ca nu s-au sacrificat pentru patrie ci au abandonat proiectul si s-au concentrat pe locomotive de marfa (bine, daca acum primesc rame, poate ca in final le-a iesit).
- punmeister
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
punmeister
Bine, proiectul inca exista, doar ca trebuie capacitate de productie.
Bine, proiectul inca exista, doar ca trebuie capacitate de productie.
- shoppy
-
Posted:
-
Re: Rame electrice Alstom Coradia Stream
shoppy
Daca curgeau banii garla se gasea imediat si capacitatea de productie.
Daca curgeau banii garla se gasea imediat si capacitatea de productie.
📖 Pagination options